Concrete & masonry
How much concrete do I need for a 3 x 3 m slab?
For a 3 m by 3 m slab at 100 mm thick, the calculator works out 104 bags of 20 kg concrete mix, or 1.0 m³ of ready-mix, with about 1.08 tonnes of crushed rock base if you lay one.
Shopping list
| Item | Buy | Note |
|---|---|---|
| Concrete mix, 20 kg bags | 104 bags | 0.00909 m³ per 20 kg bag (110 × 20 kg bags per m³, scaled by weight) |
| Crushed rock base (50 mm compacted, if used) | 1.08 t | 0.45 m³ compacted |
- Bag yields differ between brands (Boral lists 108 bags of 20 kg per m³, Cement Australia 110). Check the yield on your own bag.
How this was worked out
- Area:
length × width
3 × 3 = 9 m² - Volume:
area × thickness ÷ 1000
9.00 × 100 ÷ 1000 = 0.9 m³ - With waste:
volume × (1 + waste)
0.900 × 1.05 = 0.95 m³ - Bags (20 kg):
volume with waste ÷ yield per bag, rounded up
0.945 ÷ 0.00909 = 103.95 bags - Ready-mix:
volume with waste, rounded up to the order step
0.945 → steps of 0.2 m³ = 1 m³ - Base:
area × base depth ÷ 1000 × compacted density
9.00 × 50 ÷ 1000 × 2.4 = 1.08 t
What the calculator tells you for a 3 x 3 m slab
| Scenario | Area | Volume | With 5% waste | 20 kg bags | Ready-mix | Crushed rock base (50 mm compacted) |
|---|---|---|---|---|---|---|
| 3 m x 3 m x 100 mm (AU and NZ) | 9 m² | 0.9 m³ | 0.95 m³ | 104 | 1.0 m³ | 1.08 t |
| 3 m x 3 m x 75 mm (AU and NZ) | 9 m² | 0.67 m³ | 0.71 m³ | 78 | 0.8 m³ | 1.08 t |
| 6 m x 4 m x 100 mm (AU and NZ) | 24 m² | 2.4 m³ | 2.52 m³ | 278 | 2.6 m³ | 2.88 t |
| 2 m x 1.2 m x 100 mm (AU and NZ) | 2.4 m² | 0.24 m³ | 0.25 m³ | 28 | 0.4 m³ | 0.29 t |
The bag counts in the table are rounded up for purchasing. The working figures behind them are 103.95, 77.96, 277.2 and 27.72 bags respectively. Cement Australia's slab calculator page says the calculation includes a 5% allowance for wastage and rounds bags up, which is the approach reflected here.
Worked example
Take the first scenario: a 3 m by 3 m slab at 100 mm thick, using 20 kg bags and the default 5% waste allowance.
Area = 3 m x 3 m = 9 m².
Volume = 9 m² x 0.1 m = 0.9 m³.
With waste = 0.9 m³ plus 5% = 0.95 m³.
Bags (20 kg) = 103.95 bags, rounded up to 104 bags.
Ready-mix = 1.0 m³.
Base = 1.08 t of crushed rock at 50 mm compacted, if you use one.
The same steps apply to any size. For the 6 m by 4 m slab the area is 24 m², the volume is 2.4 m³, the waste-inclusive figure is 2.52 m³, and the bag count is 277.2 rounded up to 278. For the narrow 2 m by 1.2 m path the area is 2.4 m², the volume is 0.24 m³, the waste-inclusive figure is 0.25 m³, and the bag count is 27.72 rounded up to 28.
Bags or ready-mix
Bag yields differ between products, so the bag count is only as good as the yield you use. Cement Australia's Concrete Mix product data sheet states that 110 bags of 20 kg are required per cubic metre. Boral's Concrete Mix product data sheet states that 108 bags of 20 kg equate to one cubic metre of mixed concrete. The slab calculator uses a concrete mix figure of the kind quoted by Cement Australia and Boral. A Post Mix figure, such as the one Bunnings quotes for its own product, is a different product with a different yield, so check your product label or supplier rather than mixing the two figures.
Ready-mix is ordered by volume rather than by bag. A rule of thumb holds that above about 1 m³ a ready-mix delivery is usually easier than mixing bags, though you should ask your supplier about minimum orders and short-load fees. Ready-mix plants typically work in ordering steps of 0.2 m³, so confirm the granularity with your local plant. At the default 3 m by 3 m by 100 mm size the calculator shows 1.0 m³; at 75 mm thick it shows 0.8 m³; and for the small 2 m by 1.2 m path it shows 0.4 m³.
The base underneath
Cement Australia's how-to for laying a concrete slab describes excavating an extra 5 cm and compacting crusher dust or road base to 5 cm. The calculator's base line works on the same idea: 50 mm of compacted crushed rock, shown as "if used". Australian Native Landscapes quotes a compacted density of 2.4 t/m³ for road base, DGB and FCR, which is the figure behind the tonnage in the table.
For the 3 m by 3 m slab that comes to 1.08 t. For the 6 m by 4 m slab it is 2.88 t. For the 2 m by 1.2 m path it is 0.29 t. The base figure stays the same when you change the slab thickness, because the base depth is set separately from the concrete depth.
Thickness: 100 mm or 75 mm
The calculator defaults to 100 mm. Cement Australia's slab calculator page states that the minimum thickness for a non-load bearing slab would be 75 mm, and advises consulting a professional for loads. At 75 mm the 3 m by 3 m slab needs 78 bags of 20 kg mix, or 0.8 m³ of ready-mix, against 104 bags or 1.0 m³ at 100 mm. The base tonnage is unchanged at 1.08 t either way. Which thickness suits your patio, shed base or path depends on what the slab has to carry, so check your product label or supplier and, where loads are involved, get advice.
Mesh and reinforcement
The calculator's default is no mesh. If you add mesh, InfraBuild's ribbed square mesh page lists SL72 and SL82 with an effective area of 5.8 m by 2.4 m per sheet. Compare those dimensions with your slab and check your product label or supplier for the sheet that matches your layout.
Common mistakes
- Using a Post Mix yield for a concrete mix job. Post Mix and concrete mix are different products, and the calculator uses the concrete mix figure quoted by Cement Australia and Boral. Check your product label or supplier.
- Applying one brand's yield to another brand's bag. Cement Australia quotes 110 bags per cubic metre and Boral quotes 108, so the count shifts slightly between products.
- Dropping the 5% waste allowance. The calculator includes it, and Cement Australia's slab calculator page says a 5% wastage allowance is part of the calculation.
- Rounding bags down. The working figure of 103.95 bags becomes 104, not 103.
- Ordering ready-mix to the exact decimal. Plants work in steps of 0.2 m³ as a rule of thumb, and minimum orders and short-load fees vary, so confirm both with your supplier.
- Treating the base as a fixed tonnage regardless of compaction. The figure assumes 50 mm compacted crushed rock at 2.4 t/m³.
- Assuming the mesh default covers your slab. Mesh is switched off by default, and sheet coverage is a separate calculation.
Frequently asked questions
How many 20 kg bags do I need for a 3 x 3 m slab at 100 mm thick?
104 bags. The working figure is 103.95 bags, rounded up from 0.95 m³ of concrete after the 5% waste allowance.
How much ready-mix is that?
1.0 m³ for the 3 m by 3 m slab at 100 mm thick. At 75 mm thick the figure is 0.8 m³.
How much crushed rock base do I need?
1.08 t for the 3 m by 3 m slab, at 50 mm compacted, if you use a base. The 6 m by 4 m slab needs 2.88 t and the 2 m by 1.2 m path needs 0.29 t.
Do bag sizes in New Zealand change the count?
The calculator returns the same figures for Australia and New Zealand at these sizes, based on 20 kg concrete mix bags. In New Zealand, Dricon (Firth) HandiCrete quotes a 25 kg bag yield of 0.010 m³ and a 40 kg bag yield of 0.016 m³, so work from the yield printed on your bag label.
What thickness should I pour?
The calculator defaults to 100 mm. Cement Australia's slab calculator page gives 75 mm as the minimum thickness for a non-load bearing slab and recommends consulting a professional for loads, so the choice depends on what the slab will carry.
Sources and assumptions
These are the settings behind every number above. Verified figures link to a source. Editable defaults are common rules of thumb: change them to match your product and your site.
| Setting | Value | Status | Source |
|---|---|---|---|
| concrete bags per m3 20kg cement australia | 110 bags/m3 | Verified 2026-11-18 | Cement Australia Concrete Mix product data sheet (PDS CM rev 3): 110 x 20 kg bags are required per cubic metre. |
| concrete bags per m3 20kg boral | 108 bags/m3 | Verified 2026-11-18 | Boral Concrete Mix product data sheet: 108 x 20 kg bags equate to one cubic metre of mixed concrete. |
| concrete bag yield 25kg | 0.01 m3 | Verified 2026-11-18 | Dricon (Firth) HandiCrete page: 25 kg bag yield 0.010 m3. |
| concrete bag yield 40kg | 0.016 m3 | Verified 2026-11-18 | Dricon (Firth) HandiCrete page: 40 kg bag yield 0.016 m3. |
| concrete slab waste | 5 % | Verified 2026-11-18 | Cement Australia slab calculator page: calculation includes a 5% allowance for wastage and rounds bags up. |
| concrete slab thickness path | 100 mm | Editable default | common practice for paths and patios (Cement Australia how-to uses a 100 mm slab as its example), editable |
| concrete slab min thickness | 75 mm | Verified 2026-11-18 | Cement Australia slab calculator page: minimum thickness for a non-load bearing slab would be 75 mm (consult a professional for loads). |
| concrete readymix order step | 0.2 m3 | Editable default | typical ready-mix ordering granularity, rule of thumb, editable; confirm with local plant |
| concrete readymix consider m3 | 1 m3 | Editable default | Rule of thumb: above about 1 m3 a ready-mix delivery is usually easier than mixing bags. Editable; ask your supplier about minimum orders and short-load fees. |
| concrete base depth | 50 mm | Verified 2026-11-18 | Cement Australia how to lay a concrete slab: excavate an extra 5 cm and compact crusher dust or road base to 5 cm. |
| landscape density roadbase compacted | 2.4 t/m3 | Verified 2026-11-18 | Australian Native Landscapes product weights FAQ: road base/DGB/FCR 2.4 t/m3 (compacted figure). |
| concrete mesh effective length | 5.8 m | Verified 2026-11-18 | InfraBuild ribbed square mesh page: SL72 and SL82 effective area 5.8 x 2.4 m. |
| concrete mesh effective width | 2.4 m | Verified 2026-11-18 | InfraBuild ribbed square mesh page: SL72 and SL82 effective area 5.8 x 2.4 m. |
Keep reading
- How many 20 kg bags of concrete make a cubic metre?Brands list 100 to 110 bags of 20 kg mix per cubic metre. Here is why they differ, how to read your bag, and…
- How many pavers do I need for a 4 x 3 m patio?A 4 x 3 m patio needs 79 pavers of 400 x 400 mm with waste, plus road base and bedding sand. See the dig…